Block 216.

REFA Erected Twin Transfer Columns and Bracing at Block 216 Future Home of The Ritz-Carlton.

Portland, Oregon

Delivery of twin transfer columns and bracing arrived early on Saturday morning to the north side of Block 216 at 10th and SW Washington Street. REFA Erection was prepared with a small crew of ironworkers to safely unload, fly, and accurately place each column. Weighing in at approximately 27,000 lbs. and 22,000 lbs., these columns look more like art than science and will eventually be embedded in concrete.

Contact us today to bid on your next steel project!

Previous
Previous

Clackamas Community College Welcome Center - Topping Out.

Next
Next

Hayward Field Renovation.